Pressure Cooling Systems – New !

14 November 2014

The Pressure Equipment (PE) for cold groups in manufacture and in service are subject to a new Professional Technical Manual (CTP) applicable since 25 July 2014.

This Technical Workbook:

 

  • Replaces CTP No. 1, 2 and 3, which had existed since 2004 for the manufacture and in-service monitoring of refrigeration systems under pressure.
  • Simplifies the implementation of regulatory requirements
  • Is approved by circular BSEI 14-078 of 7 July 2014 applicable without a transitional period to 25 July 2014.
  • Applies to new PSEs according to PED97 / 23, to ESPs CE marked according to the old CTPs, but also to those built according to the old provisions (Ministerial Decree of 25 April 1960 and associated circulars)

 

This new CTP focuses on the initial documentary system and especially on the traceability of operations. The evidence of the operations carried out is now necessary to continue to benefit from the installations of the CTP throughout the lifetime of the installations.

 

For more information, read this article.

Follow us
Subscribe to the newsletter
About SIRFULL

Sirfull is a software vendor with a strong industrial culture and French know-how, which develops solutions that enable its customers to anticipate changes in their market.

More